- Segregation of Raw materials based on specification and application of the springs.
- First piece/sample approval.
- On line inspection and process control Batch/Sample inspection or production.
- Internal lnspection Reports for every batch consisting of dimensional specification and load-defection characteristics.
- Material certificates specifying chemical & physical properties, as required.
- All our measuring instruments, spring testers and temperature gauges and calibrated periodically.